What a weekly update from your dev partner should contain

A weekly software project update should show progress against a milestone, a working demo, decisions needed, risks and next steps. A template to ask for.

The short answer

A good weekly update shows what was finished and can be seen, progress against the current milestone, decisions waiting on you, risks and changes to scope or timing, and what happens next week. It is short, written and honest about what slipped.

On this page
  1. What should every weekly update contain?
  2. A short template
  3. What makes an update good?
  4. Why include a demo?
  5. What about quality in the update?
  6. How do you use the update?
  7. What if the updates stop?
  8. What does a call add?
  9. How long should an update be?
  10. What do red and green mean?
  11. What if you are not technical?
  12. Who should receive it?
  13. Working with us

Silence is the most expensive thing in a software project. A weekly update keeps you in control without reading code. Ask for one in the contract; here is what it should hold.

What should every weekly update contain?

  1. Done this week. In plain words, things you can see or try. “Customers can reset their password” beats “worked on authentication.”
  2. A link to the working version. A staging copy you can click through, or a short recorded demo.
  3. Progress against the milestone. What share of the current milestone is complete, and whether the date still holds.
  4. Next week. The two or three things planned.
  5. Decisions needed from you. Each with a deadline and the cost of waiting.
  6. Risks and unknowns. What might slow things, and what is being done about it.
  7. Changes. Anything added to or removed from scope, with the effect on cost and date.
  8. Spend. On time and materials: hours or budget used against the cap. On fixed price: milestones invoiced.

A short template

Week of: 
Milestone: (name, due date, on track / at risk / late)

Done (with link to see it):
- 
Next week:
- 
Needs your decision (by when):
- 
Risks:
- 
Scope changes since last update:
- 
Budget used:

What makes an update good?

Good Poor
Specific, visible outcomes Activity descriptions
Admits delays early Reports green until the end
Names the decision it needs Buries questions
Same format each week Different every time
Short, one page A wall of status

Why include a demo?

Reports can be optimistic. A working version cannot. Even a two-minute screen recording each week shows what exists. It also shows quality: how the app behaves, not how it is described.

What about quality in the update?

Ask the update to mention what was tested, and whether production is healthy: backups running, monitoring clear, deploys successful. See how to check a dev agency’s work.

How do you use the update?

  • Read it. Reply with decisions within a day.
  • Compare it to the milestone plan. Raise slips immediately, not at the end.
  • Keep the changes list: it is your defense against scope creep. See how estimates go wrong.
  • Once a month, ask: are we closer to the goal in the brief?

What if the updates stop?

Ask for them in writing. If they do not return, treat it as a risk signal, and confirm that you hold your repository and accounts. See what if your developer disappears.

What does a call add?

A weekly 15 to 30 minute call, ideally across the overlap hours if you are in a different time zone, helps with decisions. The written update remains the record. See hiring developers in Europe from the US.

How long should an update be?

One page. If it takes more than five minutes to read, it will not be read. Put the decisions you need to make at the top, because those are the only parts that need your action. Put the detail below, for when you want it.

What do red and green mean?

Ask for a plain status on the milestone: on track, at risk, late. Agree what each means. “At risk” should mean there is a specific cause and a plan. A project that is green for twelve weeks and then red on the last day was not honestly reported. A good partner raises “at risk” early, and treats it as a normal part of the work, not a failure.

What if you are not technical?

You do not need to understand every line. You need three things: something to click, a plain statement of what changed, and a list of what you must decide. If an update contains terms you do not know, ask for them to be explained once and then put in a short glossary. Over time the updates should get easier to read, not harder.

Who should receive it?

Everyone with a stake in the decisions: the person who owns the budget, the person who owns the product, and anyone who must prepare something on your side, such as support. Keep the list short and the thread single, so decisions are not scattered across channels.

Working with us

Each client gets a short written update by email each week: what was finished and where to see it, progress against the current milestone, decisions we need from you, risks, and what comes next. At each milestone there is a demo. Tell us about your project through contact; see software services.

Keep reading

Tell us what you want to build.

A product, a website, a search problem or a system that should work better. We reply with a plain answer and the first step.

A few sentences are enough (at least 20 characters).

We use your details only to answer your inquiry. See our privacy policy.