Red flags in a software development proposal

Twelve red flags to spot in a software development proposal or quote, from vague scope to missing ownership terms, with the question to ask for each.

The short answer

Warning signs in a proposal are vague scope, a price with no breakdown, no list of exclusions, no milestones, unnamed people, missing ownership terms and no word on hosting, backups or support after launch. Each one has a question that exposes it.

On this page
  1. 1. The scope is a paragraph
  2. 2. There is no list of exclusions
  3. 3. A single total with no breakdown
  4. 4. A price far below the others
  5. 5. No milestones or demos
  6. 6. The people are not named
  7. 7. Technology choices with no reasons
  8. 8. Nothing about ownership
  9. 9. Nothing about testing or quality
  10. 10. No plan for production
  11. 11. Vague change handling
  12. 12. Pressure to sign
  13. What do good proposals have in common?
  14. How should you compare proposals?
  15. What if everything looks fine and you still feel unsure?
  16. What is one question that reveals most of these?
  17. Is one red flag a reason to walk away?
  18. What should you do with your own side of the proposal?
  19. Working with us

A proposal tells you how the studio thinks. A good one shows what will be built, what will not, and how you will know it is on track. A weak one shows a price and a promise. Here are the red flags, each with the question to ask.

1. The scope is a paragraph

“Build a platform for X with user management and reporting” can mean ten different things. Ask: what are the screens, roles and workflows, and what does “done” mean for each?

2. There is no list of exclusions

Every project leaves things out. If the proposal does not say what, you will find out when you ask for it. Ask: what is not included? What are the three things you expect me to ask for later?

3. A single total with no breakdown

A lump sum hides the assumptions. You cannot compare it, and you cannot cut anything. Ask: how is this split by phase or feature, and which parts carry the most uncertainty?

4. A price far below the others

Someone is making different assumptions, or plans to recover the difference in change requests. Ask: what is this price based on, and what happens if the assumption is wrong?

5. No milestones or demos

If the first time you see the product is the end, you carry all the risk. Ask: when will I see working software, and what will I be able to do with it?

6. The people are not named

You are buying the team, not the logo. Ask: who will work on this, what is their role, and will they be there for the whole project?

7. Technology choices with no reasons

“We use the latest framework” is not a reason. Exotic stacks make it harder to hire someone else later. Ask: why this stack, and who else can maintain it?

8. Nothing about ownership

The proposal should say who owns the code, where it lives and whose accounts the hosting and domains are in. Ask: will the repository and cloud accounts be in my name from the first week? See who owns the code.

9. Nothing about testing or quality

If tests, code review and a staging environment do not appear, quality is left to chance. Ask: how do you check your own work before I see it? See how to check a dev agency’s work.

10. No plan for production

Hosting, monitoring, backups and security updates are part of a real product. Ask: how will you know the app is down, and how do you prove a backup restores? See hidden costs after launch.

11. Vague change handling

Scope changes are normal. What matters is how they are priced and approved. Ask: how do you handle a change request, and who approves the cost before work starts?

12. Pressure to sign

“The price is only valid until Friday” is a sales tactic. A good studio can wait while you ask questions. Ask: can I have a week to compare and talk to a reference?

What do good proposals have in common?

Good sign What it looks like
Specific scope Screens, roles, workflows listed
Honest unknowns Risks named with a plan to test them first
Phases A small first milestone you can judge
Named people Who, and in which role
Exclusions A clear “not included” list
Ownership Code and accounts in your name
Production Hosting, monitoring, backups, support described

How should you compare proposals?

Put them side by side on the same list: scope, exclusions, milestones, people, ownership, post-launch. Score each blank as a risk. The cheapest proposal with the most blanks is rarely the cheapest outcome. For pricing models, see fixed price or time and materials.

What if everything looks fine and you still feel unsure?

Ask for a small paid first step. Two weeks of real work reveals more than any document.

What is one question that reveals most of these?

“Walk me through what happens in the first month.” A good studio lists who does what, which decisions they need from you, what you will see and when. A weak one talks in generalities. The answer touches scope, people, milestones, accounts and quality at once.

Is one red flag a reason to walk away?

Not always. Read it as a prompt to ask. A missing exclusions list can be a draft that was not finished; a vague scope can be fixed in a discovery. What should worry you is a pattern, and a response to questions that is defensive or slow. A good studio is glad you asked.

What should you do with your own side of the proposal?

Check your responsibilities too: what the studio expects from you, how quickly, and what happens if you are late. A proposal that lists only the studio’s duties is incomplete. Projects slip as often from late decisions as from late code.

Working with us

If you have a proposal you want a second opinion on, or you want to talk through a project before asking for quotes, send us the details through contact. See software services.

Keep reading

Tell us what you want to build.

A product, a website, a search problem or a system that should work better. We reply with a plain answer and the first step.

A few sentences are enough (at least 20 characters).

We use your details only to answer your inquiry. See our privacy policy.