The short answer
Fixed price puts the risk of unknowns on the studio and suits well-defined scope. Time and materials puts it on you and suits uncertain or evolving work. Many projects use a fixed first phase and then switch. AAAutomations works on fixed prices only, phase by phase.
On this page
- How do the models differ?
- When is fixed price a good fit?
- When is time and materials a good fit?
- What is the hybrid?
- How do you choose?
- What should any model include?
- What should you watch in each?
- What do we offer?
- What happens when scope changes under a fixed price?
- How do you cap a time-and-materials contract?
- What about payment schedules?
- Working with us
Both models work. The question is who carries the risk of the unknown, and whether the scope is known well enough for a fixed number to be honest.
How do the models differ?
| Fixed price | Time and materials | Retainer | |
|---|---|---|---|
| You pay | An agreed amount for an agreed scope | For time actually spent, at agreed rates | A recurring fee for reserved capacity |
| Risk of overrun | Studio | You | Shared by priorities |
| Flexibility | Low: changes are re-quoted | High | High within capacity |
| Needs | A detailed, stable scope | Trust and visibility | Ongoing work |
| Typical fit | Well-defined builds, a fixed first milestone | Discovery, evolving products | Upkeep and continuing development |
When is fixed price a good fit?
- The scope is written down and unlikely to move.
- You have done similar work before, or the studio has.
- You need a number for budgeting or fundraising.
Be aware of the trade: because the studio takes the risk, the price includes a margin for unknowns, and every change becomes a negotiation. A very low fixed price on a vague scope is a red flag; see red flags in a proposal.
When is time and materials a good fit?
- You are exploring and expect to learn as you go.
- You want to steer priorities week by week.
- The work is hard to define up front, such as a rebuild with undocumented behavior; see the cost of rebuilding a legacy app.
The risk is open-ended spend. Protect yourself with a budget cap, a weekly update and a regular review. See what a weekly update should contain.
What is the hybrid?
A common pattern: a short, fixed-price discovery or first milestone to remove the biggest unknowns, then either a fixed price for the clarified scope or time and materials for the rest. You get early learning for a limited amount and a basis for a real quote. See how to budget an MVP from an idea.
How do you choose?
Ask yourself:
- Can I write the scope down so a stranger could build it? If yes, fixed price is possible.
- Will I change my mind during the project? If yes, time and materials.
- Do I need a firm number? If yes, fix the first phase at least.
- Can I supervise a time-based contract? If not, prefer fixed milestones.
What should any model include?
- A clear scope or budget cap.
- Milestones with demos.
- A defined way to handle changes.
- Your repo and accounts, from the start.
- A way to stop at a milestone.
What should you watch in each?
- Fixed: the proposal that cuts corners to fit; missing tests, no handover, thin post-launch.
- Time and materials: hours without output; ask for working software at each checkpoint.
- Retainer: paying for capacity that goes unused; see retainer or project.
What do we offer?
We work on fixed prices only, and we do not bill by the hour. To keep a fixed number honest, we fix one phase at a time: a scoping sprint from €500, credited against the build, then a fixed quote for the scope it produced. Changes during the build are quoted as fixed additions before we do them. After launch, an optional monthly care plan covers upkeep. Our launch prices are on the services page. See first two weeks of a project.
What happens when scope changes under a fixed price?
Every change becomes a mini-negotiation: the studio estimates it, you approve it, the price moves. That is not a flaw; it is how the model keeps both sides honest. The danger is a proposal that is cheap because it excludes things you will need, which come back as paid changes. Ask for a list of what you are likely to need that is not in the scope, and ask what each would cost to add later, so changes are not a surprise.
How do you cap a time-and-materials contract?
Set a budget cap per phase, ask for a report of hours against the cap in each weekly update, and agree that work beyond the cap needs your written approval first. Ask for a working demo at each checkpoint, since hours alone do not show progress. If the cap will be exceeded, you decide whether to cut scope, extend, or stop.
What about payment schedules?
Tie payments to milestones you can verify, not only to dates. A common pattern is a small share at kickoff, then payments at accepted milestones. Avoid paying the bulk up front; avoid a final payment so large that the studio loses interest in the handover. See what a good software development contract includes.
Working with us
After a short first call, we propose a scoping sprint or, for a small and clear job, a fixed quote straight away. Tell us about the project through contact; see software services.