The short answer
In the first two weeks a good studio clarifies the goal and users, tests the riskiest unknown, sets up accounts in your name, agrees a scope with exclusions, and fixes the first milestone. At AAAutomations, projects start with a short call and a fixed-price scoping sprint that ends in a written scope and a fixed quote.
On this page
- What should happen in the first two weeks?
- Why fix the first milestone?
- What should you have at the end of week two?
- What should you provide?
- What if discovery changes the plan?
- What we do
- Red flags in the first fortnight
- How do you know discovery is working?
- What does a good kick-off meeting cover?
- What goes wrong in a typical first fortnight?
- Working with us
The start of a project sets its course. A good first fortnight leaves you with a clear scope, a working foundation and a first milestone you can judge. A bad one leaves you with a contract and a sense that things are happening.
What should happen in the first two weeks?
Week 1: understand and agree
- Kick-off. Goal, users, constraints, who decides. Written down.
- Discovery. The studio reads your brief and asks questions. See how to write a brief.
- The one job. One sentence that every feature is judged against.
- Risk list. What could make this fail or cost more: integrations, data, rules. Decide which to test first.
- Accounts in your name. Repository, domain, hosting, email. See who owns the code.
Week 2: scope and first milestone
- Scope with exclusions. The first version, in a list, and a written “not included”.
- A test of the riskiest unknown. A short proof: can this integration work, can this data be imported?
- Foundation. Project skeleton, deployment pipeline, a staging copy and basic monitoring so that every later change ships the same way.
- First milestone, fixed. A small, concrete deliverable with a date and a price you can agree on. See fixed price or time and materials.
- Cadence. The weekly update and the call. See what an update should contain.
Why fix the first milestone?
It gives both sides a small, safe test: can we work together, deliver on a date and agree on what done means? If it goes well, the rest is easier to price. If not, you have limited what you have spent.
What should you have at the end of week two?
| Item | Why |
|---|---|
| Written scope and exclusions | Basis for pricing and disputes |
| List of risks and the first results | Reduces the biggest unknowns |
| Repo, domain, hosting in your name | Protects you |
| A running skeleton with deployment | Every later change ships safely |
| First milestone, dated and priced | A clear first checkpoint |
| Weekly update started | Visibility |
What should you provide?
- A named decision maker who answers within a day.
- Access to existing systems, data samples and brand assets.
- Honest budget and date constraints.
- Availability for one or two calls a week.
What if discovery changes the plan?
It should. Discovery exists to find that out cheaply. If the scope shrinks, you save. If it grows, you can decide before building. See how estimates go wrong.
What we do
Our projects start the same way every time.
- A short call. You tell us the goal, who will use the result, and the limits: budget, date, existing systems.
- A scoping sprint, at a fixed price. It starts from EUR 500 and is credited against the build if you go ahead. In it we write down what will be built and what will not, sketch the architecture and design the key screens, and test the riskiest unknown where we can.
- A fixed quote for the build. Based on the written scope. Changes later are quoted as fixed additions before we do them.
- A weekly written update from the first week, and a demo at each milestone.
We do not bill by the hour, so discovery never turns into an open-ended meter. Our launch prices are on the services page.
Red flags in the first fortnight
- No written scope after two weeks.
- No staging copy or deployment process.
- Accounts in the studio’s name.
- No demo or visible output.
- Questions unanswered. See red flags in a proposal.
How do you know discovery is working?
You should be able to explain the product back, in one paragraph, to someone who was not in the room. You should know the three biggest risks and what is being done about each. You should have seen something running, even if it is only a skeleton. If, after a week, all you have is meeting notes, ask for the artifacts: the written scope, the risk list, the account checklist.
What does a good kick-off meeting cover?
- The goal in one sentence, and how success will be measured.
- Who the users are and what they must be able to do first.
- Who decides on your side, and how fast they answer.
- What is fixed (date, budget, a platform) and what is open.
- How you will talk: channel, weekly update, call.
- What happens if a decision is late.
Write the outcome down and send it to everyone the same day. The note is the first version of the scope.
What goes wrong in a typical first fortnight?
Three things, again and again. First, the studio starts building before the scope is written, and the first demo disappoints. Second, the riskiest unknown is left for later, and surfaces in month three. Third, accounts are created in the studio’s name for convenience and become a negotiation at the end. Each is cheap to avoid in week one and costly to fix afterward.
Working with us
For a new client we would start with a call and a scoping sprint, then give you a fixed quote you can compare with anyone else’s. Describe your project through contact; see software services.