How much does a SaaS MVP cost with a European studio?

What drives the cost of a SaaS MVP built by a European studio, the phases it goes through, and what to cut to fit your budget.

The short answer

The cost of a SaaS MVP depends on scope, number of user roles, integrations, data and how much design it needs. At AAAutomations, a SaaS MVP starts at €10,000 excluding VAT at our launch prices, always as a fixed quote for a written scope. Below: what drives cost, the phases, and what to cut.

On this page
  1. What drives the cost of a SaaS MVP?
  2. What phases does the work go through?
  3. What does the quote usually include?
  4. What does it not include?
  5. What can you cut to fit the budget?
  6. Why a European studio?
  7. How do you get a number you can trust?
  8. How do you protect the budget during the build?
  9. How do you compare studios on the same basis?
  10. Fixed price or by the hour for an MVP?
  11. Working with us

A fair price for a SaaS MVP is whatever buys the smallest product that tests your idea, built well enough to grow. Nobody can quote that from a title. Here is how studios arrive at a number, so you can read any quote, ours included.

What drives the cost of a SaaS MVP?

Driver Effect on cost
Number of user roles Each role needs its own screens, permissions and tests.
Core workflows The more distinct things a user can do, the more to build. One workflow done well is cheaper than five done thinly.
Multi-tenancy Keeping each customer’s data separate must be designed from the start. See proving tenant isolation in CI.
Billing Subscriptions, invoices, taxes and failed payments are bigger than they look.
Integrations Each third-party API adds build and test time.
Data import Moving existing data in is work of its own.
Design A plain interface costs less than a custom, animated one.
Compliance GDPR, accessibility and industry rules add work. See GDPR checklist.
Quality bar Tests, backups, monitoring and zero-downtime releases cost build time and save much more later.
Your speed of decisions Waiting is billed time on a time-and-materials contract and schedule slip on a fixed one.

What phases does the work go through?

  1. Discovery. Clarify the one job, the users, the risks and what is out. Output: a scope that can be priced.
  2. Design. Flows and screens for the core workflow.
  3. Build. The core workflow end to end, sign-in, roles, the essentials of admin.
  4. Hardening. Tests, security checks, backups, monitoring, deployment pipeline.
  5. Launch and learn. Real users, fixes, a decision on what next.

We sell discovery on its own, as a fixed-price scoping sprint from €500 that is credited against the build if you go ahead. It ends with a written scope, the architecture and the key screens, so the build can be quoted as a fixed price.

What does the quote usually include?

Ask that it lists: design, development, testing, deployment, hosting set-up, documentation and handover. Ask what it excludes. See red flags in a proposal.

What does it not include?

Running costs after launch: hosting, third-party services, monitoring, upkeep. See hidden costs after launch.

What can you cut to fit the budget?

  • Replace automated billing with a payment link at first.
  • Two roles, not six.
  • A responsive web app instead of native apps.
  • Manual import instead of integration.
  • Plain design now, polish after you have users.

Do not cut security, backups or the data model.

Why a European studio?

We are a studio in Athens, in the EU. We quote in euros, as a fixed price, and we do not bill by the hour. Our time zone overlaps with the UK and EU working day fully and with the US East Coast in the afternoon; see hiring developers in Europe from the US.

How do you get a number you can trust?

Send a brief; see how to write a brief a studio can quote from. Ask for a range with assumptions and exclusions.

How do you protect the budget during the build?

Keep a visible list of requests, and for each one write what it displaces or adds. Decide at each milestone, not at the end. Hold back “one more feature” until the first version has users. See how to budget a SaaS MVP when you only have an idea.

How do you compare studios on the same basis?

Give each the same brief and ask for the same things back: a list of what is included, a list of what is not, the phases with a deliverable at each, the people who will do the work, and the running costs after launch. Compare line by line. A lower total with more blanks is not lower. See red flags in a software development proposal.

Fixed price or by the hour for an MVP?

Often both: a fixed price for a short first phase, then either a fixed price for the clarified scope or time and materials for the rest. See fixed price or time and materials.

Working with us

We start with a short call about the idea, the users and the limits, then a fixed-price scoping sprint, then a fixed quote for the first version. Our launch prices are on the services page. Describe your idea through contact, and see our SaaS platform service.

Keep reading

Tell us what you want to build.

A product, a website, a search problem or a system that should work better. We reply with a plain answer and the first step.

A few sentences are enough (at least 20 characters).

We use your details only to answer your inquiry. See our privacy policy.